Attachment Kit (Option) - Furuno FSV-35 Installation Manual

Color scanning sonar
Hide thumbs Also See for FSV-35:
Table of Contents

Advertisement

1. HOW TO INSTALL THE SYSTEM
Note: Inscribe the bow mark to the attachment flange.
1.9

Attachment Kit (option)

The attachment kit permits use of the retraction tank for the CSH-20 series using the
1600 mm stroke transducer and hull unit FSV-243E/244E.
Attachment kit (Type: OP10-24. Code No.: 006-943-530)
Name
Insulation Gasket
Insulation Gasket (2)
1. Clean the flange and O-ring groove of the retraction tank (welded to hull) with ethyl
alcohol moistened waste cloths. Coat O-ring and O-ring groove with lithium
grease. Place the O-ring in its groove on the tank flange.
2. Lay the insulation gaskets on the top of the tank flange.
3. Position the hull unit so that the bow mark (inscribed) on its flange points toward
the ship's bow. Note that heading adjustment in the monitor is required if the bow
mark does not physically face the ship's bow.
4. Confirm the following points as below and place the hull unit on the tank.
• Clean the flange platform.
• Wipe the undersurface of the hull unit flange with clean waste cloths.
• Keep O-ring in its position.
5. Insert the insulation gaskets (2) into the bolt holes of the tank flange.
1-14
Type
MS-1000-67
000-857-220
MS-1000-68
000-857-221
Hex. bolt
Flat washer
Hull unit flange
O-ring
Flat washer
Spring washer
Hex. nut
Attachment flange
O-ring
Retraction tank
Flat washer
Spring washer
Hex. nut
Code No.
Qty
24
24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsvb-35sFsv-35s

Table of Contents