Download Print this page

Installation Dimensions - Genius Euro Trigon 02 Instructions Manual

Advertisement

ENGLISH
3. ELECTRICAL EQUIPMENT (standards system)
1)
Operators
2)
Photocells
3)
Electronic equipment
4)
Key-operated push-button
5)
Radio receiver
6)
Flashlight
Notes: 1) To lay electrical cables, use adequate rigid and/
or flexible tubes.
2) Always separate low voltage accessories from
those operating at 230V~. To avoid any
interference, always use separate sheaths.
4. INSTALLATION OF AUTOMATION
4.1.
PRELIMINARY CHECKS
To ensure safety and an efficient automation, make sure the
following requirements are met:
The gate structure must be suitable for automation. In
particular, make sure it is sufficiently sturdy and rigid, and
that its dimensions are in line with those indicated in the
technical specifications.
Make sure that the leaves move properly and uniformly,
without any irregular friction during their entire travel.
Check if hinges are in good condition.
Make sure the travel limit mechanical stops are present.
We advise you to carry out any metalwork jobs before
installing the automation.
4.2.

INSTALLATION DIMENSIONS

Establish the installation position of the operator by consulting Fig.
4-5-6.
•measurements in mm
4.2.1. RECOMMENDED DIMENSIONS FOR INWARD OPENING
Notes: As for 120° openings the curved arm must be fixed
to the hole marked with the letter X
A
60÷110
110÷160
160÷210
210÷260
260÷310
310÷360
60÷110
110÷160
Fig. 3
160÷210
210÷260
•measurements in mm
4.2.2. RECOMMENDED DIMENSIONS FOR OUTWARD OPENING
A
60÷110
110÷160
160÷210
210÷260
260÷310
Fig. 4
•measurements in mm
6
B
C
B
C (max)
110÷130
730
110÷130
720
110÷130
710
110÷130
700
110÷130
690
110÷130
670
190÷210
650
230÷250
600
290÷310
540
310÷330
510
B
C
B
C (max)
110÷130
430
110÷130
380
110÷130
330
110÷130
280
110÷130
240
X
α α α α α
90°
90°
90°
90°
90°
90°
120°
120°
120°
120°
Fig. 5
α α α α α
90°
90°
90°
90°
90°
Fig. 6

Advertisement

loading