6 Ensure that a single-point ground reference is available for all the power
outlets serving the CallPilot server and its peripherals. Before the
CallPilot server installation, a qualified electrician must implement the
single-point ground reference requirement between the power outlets of
the CallPilot server and the power outlets of the switch.
7 Connect the power cord to the modem, and plug the other end into a wall
receptacle or power bar.
Note: Ensure that the power source is consistent with the SBC for all
ancillary equipment.
8 Turn on the modem.
What's next?
Continue with "Connecting the server to the ELAN" on page 68.