Pre-Installation Equipment Verification; General; Table 2. Nhtc/Nhpc Characteristics - Nortec NHPC Engineer's Manual

Nh series electrode steam humidifier
Table of Contents

Advertisement

3. PRE-INSTALLATION EQUIPMENT VERIFICATION

A. GENERAL
(1) Ensure the available voltage and phase correspond with humidifier voltage and
phase as indicated on the humidifier's specification label.
(2) Ensure that the external fuse disconnect is sufficient size to handle the rated
amperage as indicated on the humidifier's specifications label. Refer to local building
codes.
(3) Report any discrepancy immediately to the site engineer.
(4) Location and mounting is described in Chapter 10-10.
(5) For typical installation see Figures 6 & 7.
10-00
Page 9
2008-10-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nhtc

Table of Contents