Husqvarna PT-26D Operator's Manual page 100

Hide thumbs Also See for PT-26D:
Table of Contents

Advertisement

Maintenance
7. Remove the pins from the shafts and remove the
shafts from the link joints.
8. Remove the screws for the bearing brackets.
9. Remove the adjustment screw from its mounting.
TIP! Measure where the lock nut is located on the
adjustment screw.
10. Move the cutting unit sideways to the new position.
11. Screw in the adjustment screw for the tilt angle a
few turns. Left-hand position green, right-hand
position red, see figure.
12. Move the dampers to the new position. Left-hand
position green, right-hand position red, see figure.
13. Install the bearing brackets. Left-hand position
green, right-hand position red, see figure. The
right-hand bearing bracket must be installed in the
mounting in the cover to prevent movement
against the underneath of the unit mounting' s
arm.
98
Release the link joints
Position L green, Position R red
8009-776
8043-051

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents