Mitsubishi Electric PCFY-P40VGM-E Technical & Service Manual page 26

Split-type, heat pump air conditioners
Hide thumbs Also See for PCFY-P40VGM-E:
Table of Contents

Advertisement

OPERATING PROCEDURE
6. Removing the vane motor
(1) Remove the air intake.
(2) Remove the left side panel.
(3) Remove the relay connector of vane motor.
(4) Remove the electrical box.
(5) Remove the screws of vane motor, then remove vane
motor.
(Note)
Connect the lead wires and connectors properly and place
them in the proper position so that the wires are not pinched
by other parts.
7. Removing the pipe temperature thermistor
(1) Remove the air intake grille.
(2) Remove the right side panel.
(3) Remove the relay connector of the pipe temperature thermistor.
(4) Remove the screw, and remove the check panel.
(5) Extract the pipe temperature thermistor from the holder.
<Caution for the installation>
There is a possibility for the short circuit when connector gets
wet by water through the thermistor lead wire.
Therefore, lead wire of the pipe temperature thermistor
should be trapped as shown in photo 6.
(6) Gas pipe temperature thermistor is inserted to the holder
of the gas pipe (Header)
Figure 4
Liquid pipe thermistor
Gas pipe thermistor
8. Removing the under panel
(1) Remove the air intake grille.
(2) Remove the beam.
(3) Remove the side panel (right and left).
(4) Unscrew the screws of the under panel, then remove the
lower panel.
Weight of the lower panel : Approx. 2kg.
Check panel
Gas pipe (Header)
PHOTOS & ILLUSTRATIONS
Photo 4
Relay connector of
the vane motor
Photo 5
Screw
Left side
panel
Photo 6
Hold
Pipe temperature thermistor
Screws
Photo 7
26
Screws
Vane motor
Relay connector of
the pipe temperature
Check
thermistor
panel
Trap
Under panel

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pcfy-p100vgm-ePcfy-p63vgm-ePcfy-p125vgm-e

Table of Contents