Periodical Maintenance - JVC GY-DV500U Service Manual

Dv
Hide thumbs Also See for GY-DV500U:
Table of Contents

Advertisement

2.5

PERIODICAL MAINTENANCE

Perform maintenance at the correct times in accordance with the maintenance table.
Fig. 2-5-1 shows the flow chart of periodical maintenance procedures at different operating hours.
1000-hour maintenance
Start
Replaced parts
Center gear assembly
Timing belt
0
Swing arm assembly
e
Cleaner assembly
2.12 Compatibility adjustment
3.7.7 Play switching point adjustment
Confirm the 3.7.8-3
PB EQ (error rate) adjustment
End
2000-hour maintenance
Start
Replaced parts
ENT. guide base
assembly
8
Tension arm sub-assembly
(
Guide rail (SUP) assembly
%
Guide rail (TU) assembly
3
Middle catcher assembly
5
Pinch roller arm assembly
9
Exit guide arm assembly
1
Drum assembly
Reel drive pulley assembly
Center gear assembly
Timing belt
°
C. lock gear (1)
C. lock gear (2)
6
Sub-brake assembly
#
Main brake (TU) assembly
$%
Reel disk assembly
7
Band arm plate assembly
0
Swing arm assembly
¤
Worm wheel 2 assembly
2
Motor bracket assembly
¢
Rotary encoder assembly
Centering arm assembly
Main cam
Sub cam
e
Cleaner assembly
2.12 Compatibility adjustment
3.7.7 Play switching point adjustment
3.7.8-1 REC Current Adjustment
3.7.8-3 PB EQ (error rate) adjustment
End
Fig. 2-5-1
6000-hour maintenance
Start
Replaced parts
Mechanism assembly
including capstan motor
and cassette housing assembly
2.12 Compatibility adjustment
3.7.7 Play switching point adjustment
3.7.8-1 REC Current Adjustment
3.7.8-3 PB EQ (error rate) adjustment
End
2-8
2-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gy-dv500e

Table of Contents