Final Check And Test Run; Final Check; Unit Test Run; Handover To The User - Daikin EWAQ016BAW Installation And Operation Manual

Packaged air-cooled water chiller
Hide thumbs Also See for EWAQ016BAW:
Table of Contents

Advertisement

5.3. Final check and test run

5.3.1.

Final check

Before switching on the unit, read the following recommendations:
When the complete installation and all necessary settings have
been carried out, be sure that all panels of the unit are closed. If
this is not the case, inserting your hand through the remaining
openings can cause serious injury due to electrical and hot parts
inside the unit.
The service panel of the switch box may only be opened by a
licensed electrician for maintenance purposes.
DANGER
Never leave the unit unattended during installation or
servicing. When the service panel is removed live parts
can be easily touched by accident.
INFORMATION
Note that during the first running period of the unit,
required power input may be higher than stated on the
nameplate of the unit. This phenomenon originates from
the compressor that needs elapse of a 48 hours run in
period before reaching smooth operation and stable power
consumption.
5.3.2.

Unit test run

INFORMATION
When the unit is powered on for the first time, an
initialisation takes place. This will take maximum 12
minutes.
When using the remote controller during the initialisation,
an error code (UH) can be displayed.
The installer is obliged to verify correct operation of the system after
installation. Therefor a test run must be performed according to the
procedures described below. At any time it is possible to check
correct operation and space heating.
INFORMATION
During the first start up of the unit (the first 48 hours of
compressor running), it might happen that the noise level
of the unit is higher than mentioned in the technical
specifications. This is not an abnormal event.
Temperature read-out mode
On the remote controller, the actual temperatures can be displayed.
1
Push and hold the
button for 5 seconds.
The leaving water temperature is displayed (icons
and
are blinking).
2
Use the
and
The entering water temperature (icons
blinking and the
icon is flashing slowly).
The indoor temperature (icons
The outdoor temperature (icons
3
Push the
button again to leave this mode. If no button is
pressed, the remote controller leaves the display mode after 10
seconds.
EWAQ016~064BAW + EWYQ016~064BAW
Packaged air-cooled water chiller
4PW70082-1C – 2013.07
and
buttons to display:
and
and
are blinking).
and
are blinking).
Procedure for space heating/cooling
1
Check the leaving water and entering water temperature through
the remote controller read-out mode and write down the
displayed values. See "Temperature read-out mode" on
page 22.
2
Select the operation mode: heating or cooling.
3
Push the
button 4 times so the
4
Perform the test as follows (when no action is performed, the
remote controller will return to normal mode after 10 seconds or
by pressing the
To test the space heating/cooling operation push the
to start the test run operation.
5
The test run operation will end automatically after 30 minutes or
when reaching the set temperature. The test run operation can
be stopped manually by pressing the
misconnections or malfunctions, an error code will be displayed
on the remote controller. Otherwise, the remote controller will
return to normal operation.
6
To resolve the error codes, see "5.5.2. Error codes" on page 23.
7
Check the leaving water and entering water temperature through
the remote controller read-out mode and compare them with the
values noted with step 1. After 20 minutes of operation an
increase/decrease of the values should confirm the space
heating/cooling operation.
INFORMATION
To display the last resolved error code, push the
1 time. Push the
normal mode.
INFORMATION
It is not possible to perform a test run if a forced operation
from the unit is in progress. Should forced operation be
started during a test run, the test run will be aborted. The
external control icon

5.4. Handover to the user

Once the test run is finished and the unit operates properly, fill-in the
sheet "Handover of the installation to the user" which is in "Annex" on
page 24.
are
icon will be displayed.
button once):
button once. If there are
button again 4 times to return to
will apear.
Installation and operation manual
button
button
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents