AMBROGIO basic User Manual page 78

Robot
Hide thumbs Also See for basic:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 64
5-Mark the areas, located in a
lower position compared to
the lawn surface (pools, areas
with significant drops, stairs,
etc.) (see example in figure).
Important
Strictly respect the distances to
avoid that the robot falls with the
risk of breaking and/or seriously
getting damaged.
6-Mark and trace the perime-
ters as shown in the figure.
– With small paths at the same
height as the lawn: 5 cm
– With small paths higher than
the lawn: 35 cm
– In presence of a fencing wall:
35 cm
Important
The passage paths (at the same
level of the lawn), necessary for
the robot to pass from one area
to the other, must not be
marked.
PERIMETER WIRE INSTALLATION
The perimeter wire may be laid un-
derground or on the ground.
Important
Start laying the perimeter wire
from the installation area of the
recharging station , leave two
metres in excess and then cut it
as appropriate in the group con-
nections phase.
elevated area
perimeter wire
pedestrian crossing
pedestrian crossing
perimeter wire
perimeter wire
- 17 -
pool
GB
IDM - 41501701100.tif
perimeter wire
wall
IDM - 41501701200.tif
IDM - 41501601600.tif
User's manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

DeluxeEvolution

Table of Contents