Selecting the
Public grid
(continued)
2. Press the 'Enter' key 2x to confirm your grid selection (or use the 'Esc'
Startup Phase
at Startup
Operation
Grid voltage 480 V Delta: 277 V WYE
Neutral conductor available in the system
Neutral conductor monitoring is activated
key to return to grid selection)
The startup phase starts again with the segment test.
=
~
-
Segment test
All display elements light up for
about one second
-
The Fronius IG Plus unit goes
through a master check list for
several seconds
The display shows 'TEST' and
indicates the respective compo-
nent which is being tested (for
example 'LED')
-
'TEST
-
Synchronization with grid
'WAIT
IG Plus is waiting for all power
supplies in the network to be on
stand-by. This procedure takes
place dependent on the DC-
voltage.
63
L1
N
L3
L2
480 V
120 °
=
~
' is shown
COM
' is shown: The Fronius
PS
=
~