2-2: Prepare NEC Express5800/ft series

With the power of NEC Express5800/ft series off, follow the steps below:
1.
Prepare NEC Express5800/ft series.
Remove all optional PCI boards.
Mount the PCI modules (for Group1/for Group2), and CPU modules (for Group1/for
Group2).
Insert only one hard disk to the slot1 of PCI module for Group1.
Remove all LAN cables.
Remove optional SCSI devices such as a tape device from the internal SCSI connector.
IMPORTANT:
the specified slots. If multiple hard disks are inserted, the hard disk to install OS cannot
be determined.
2.
Make the PCI module for Group1 primary.
The location of the parts required for operations and check are shown below.
BMC Status LED
PCI module Status LED1
PCI module
Status LED2
PCI module
(for Group2)
Do not mount any hard disk into any slots of any modules other than
PCI module
(for Group1)
CPU modules
Front View
CD-ROM drives
POWER switch