8. Fully open the 3-way valve with hexagon
socket screw key. Turn all the way up to
contact.
9. Disconnect the gauge manifold hose
from the service port.
10. Replace the service port cap and both
valve shaft caps tightly.
• Use a gauge manifold and hoses exclusive
for R410A.
• After air removal, check the tube connec-
tions for gas leak using a leakage detector
or soapy water. Regarding leakage detec-
tor, use high-sensitivity type designed spe-
cially for R410A.
3
7
1

Valve shaft cap tightening torque

Pipe size
Liquid side
Gas side

Service port cap tightening torque

11±1N·m (1.1±0.1kgf·m)

Pump down

(Pump down is adopted in the case of
unit removal for re-installation, aban-
donment, repair etc.)
Pump down is to collect the refrigerant into
the outdoor unit by control of the 2 and 3-
way valves and the compressor.
1. Stop the Heatpump operation.
11
2
1
10
10
1/4"
3/8"
1
Valve shaft cap
2
Hexagon socket screw key
3
2 - way valve
4
Service port cap
5
Vacuum pump
6
Vacuum pump adapter
7
Gauge manifold
8
Compound gauge
9
Valve shaft cap
10
3 - way valve
11
Indoor unit
10
8
3
9
4
2
Width
22mm
22mm
Torque
2. Remove both valve shaft caps of the 2
and 3-way valves.
3. Run the Heatpump at cooling test run
mode (Refer to TEST RUN). If pump
down is performed at normal cooling op-
eration, the protection system may en-
gage and stop the operation.
electrolux 11
7
8
Hi
Lo
9
4
1
5
10
5
4
6
Torque
24±3N·m
(2.4±0.3kgf·m)
24±3N·m
(2.4±0.3kgf·m)
6