Connecting The Pipes; Air Removal - Electrolux EXH09HX Installation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

10 electrolux
R410A tool: 0-0.5mm
Conventional tool: 1.0-1.5mm
5. Checking
To be flared perfectly circular.
Flare nut not missing.

Connecting the pipes

1. Tighten the flare nuts by hand for the first
3-4 turns.
2. Use two wrenches to tighten up the
pipes.
1
Flare body
2
Flare nut
3. Wind coating tape around refrigerant
pipes together with drain hose and elec-
trical cable for general.
1
Coating tape
– Lay the drain hose below the pipes.
– The thermal insulation should cover
both the GAS and LIQUID pipes as
A
1

Air removal

2
Use an adapter for preventing vacuum pump
oil from flowing back to the gauge manifold
hose.
ON/OFF operation of the vacuum pump
should be made by the adapter switch.
1. Remove both valve shaft caps of the 2
2. Remove the service port cap of the 3-
3. Connect the gauge manifold hose to the
1
4. Open the gauge manifold valve and op-
5. Close the gauge manifold valve.
6. Turn off the vacuum pump.
7. Fully open the 2-way valve with hexagon
shown below. As insulation, use poly-
ethylene foam 6 mm or thicker.
1
5
4
1
Gas
2
Insulation
3
Liquid
4
Drain hose
5
Electrical cable
OK
OK
1
2
3
1
Gas
2
Liquid
3
Insulation
and 3-way valves.
way valve.
service port and the vacuum pump.
Be sure that the hose end to be connec-
ted to the service port has a valve core
pusher.
erate the vacuum pump for 10-15 mi-
nutes.
Make sure the compound gauge reads
-76cmHg.
socket screw key. (diagonally 4 mm)
Turn all the way up to contact.
2
3
OK
1
1
2
3
3
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Exh12hx

Table of Contents