Installation Of Servo - Part 2 (Bag I) - THUNDER TIGER Raptor 90 3D Assembly And Maintenance Manual

Table of Contents

Advertisement

5-2
Installation of Servo-Part 2
No. Material No. Description
Link Ball φ4.8
1
BK0075
2
BK0086
Ball Link 4.8x20
3
BK0095
Link Rod 2.3x76
4
BK0104
Servo Mounting Plate
5
BK0833
Servo Block
6
BK0834
Pitch Lever Fixed Plate
7
BK0839
Link Rod 2.3x30
8
BK0881
Washer
9
BK0883
Pitch Push Pull Lever
Make up the throttle and collective control pushrods according
to the drawing. Use the outermost hole on the carburetor throttle
control arm. Attach the steel ball on the throttle servo arm at
approximately the same distance as the steel ball on the throttle
arm.
Make up the throttle at 97.5mm long first, and then adjust the
pushrod length and throttle servo ATV or Endpoint so full throttle
stick command will open the carburetor barrel fully. And full low
stick and low throttle trim will close the carburetor barrel completely.
(13)
(15)
(9)
(10)
Pitch push-pull subassembly
10.5mm
(4)
(1) (14) (16)
Qty.
7
4
1
4
2
1
1
1
1
(1)
(2) (7)
(6)
(8)
(5)
(11)
(17)
No. Material No. Description
10 BK0884
Collar, d3xD4xW12
11
BV0085
Pitch Link Rod
12 HMC3-20B
Socket Screw M3x20
13 HMV840ZZY Bearing d4xD8xW3
14 HMF2-8N
Philip Maching Screw M2x8
15 HMJ2-8N
Selt-Tapping Screw M2x8
16 HML2
Nut
17 HSE2614N
Selt-Tapping Screw M2.6x14
18 HSE2620N
Selt-Tapping Screw M2.6x20
30mm
(11)
(3)
(18)
37
BAG I
Qty.
1
2
1
2
4
3
4
8
4
(2)
48mm
(7)
97.5mm
(3)
Collective Pitch
Throttle
(12)
(2)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents