Download Print this page

Initial Operation - Gardena FP 1000 Operating Instructions Manual

Fountain pump set

Advertisement

B
Installing the set as a
stream pump :
6
8
7
1

4. Initial Operation

A
Putting into operation
as a fountain pump :
9
B
Putting into operation
as a stream pump :
9
The stepped nipple (½ " / ¾ " )
example, to a stream or source stone.
1. Release the catches
2. Screw the T-piece
3. Screw the stepped nipple
A
7
T-piece
B
4. Screw the cap
Note : In the event of an uneven foundation, the fountain can be
vertically aligned with the adjustable ball joint
1. When using a gargoyle, connect the hose of the gargoyle
to the stepped nipple
2. Place the pump with the fountain on a firm base so that the
filter housing
3. Undo the fixing nut
place nozzle tube
fixing nut
4. Connect the mains plug of the pump to
an A.C. socket.
Attention : pump starts immediately.
5. Unscrew Water Bell, Fleur-de-Lis or
Water Jets out of the nozzle tube
the fountain has the required shape.
6. Adjust the size of the fountain with the
regulating valves
7. Adjust the required amount of water of
the gargoyle with the regulating valves
Note : When using a ¾ " hose, the front part of the stepped
nipple can be cut off with a saw.
1. Connect the hose of the stream to the stepped nipple
2. Place the pump with the stepped nipple
on a firm base so that the filter housing
is completely covered by water (max. 2 m
under water).
3. Connect the mains plug of the pump
to an A.C. socket.
Attention : pump starts immediately.
4. Adjust the required amount of water with
the regulating valves
6
can be used for connection, for
A
and remove the filter bowls
7
onto the adapter
6
onto the side outlet of the
.
8
onto the T-piece
6
.
9
is completely covered by water.
D
of the ball joint
3
vertically and screw
D
tight again.
5
.
0
.
B
.
1
.
7
.
2
.
2
,
3
until
2
0
0
.
6
.
9
0
3
5
D
6
6
11

Advertisement

loading

This manual is also suitable for:

Fp 1500Fp 2500