Toshiba Satellite T110 Maintenance Manual page 99

Hide thumbs Also See for Satellite T110:
Table of Contents

Advertisement

Test Program for Field.
Test Process:
1. Checks the memory size to determine the maximum size of installed
2. Tests memory addresses 0 to the maximum installed.
3. Writes, reads, and compares test data after a memory refresh cycle
NOTE: There may be a short delay between write and read operations,
depending on the memory size.
Subtest 05
Stress Test
This subtest writes the following 16KB data patterns to the Write/Read Buffer
in conventional memory.
data:
Satellite T110 and Satellite Pro T110 Tests and Diagnostics Manual
memory.
(16ms or more).
FFFFFFFFFFFFFFFF0000000000000000
5555555555555555AAAAAAAAAAAAAAAA
CCCCCCCCCCCCCCCC3333333333333333
0000000000000000FFFFFFFFFFFFFFFF
AAAAAAAAAAAAAAAA5555555555555555
3333333333333333CCCCCCCCCCCCCCCC
FFFFFFFFFFFFFFFF0000000000000000
0000000000000000FFFFFFFFFFFFFFFF
5555555555555555AAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAA5555555555555555
CCCCCCCCCCCCCCCC3333333333333333
3333333333333333CCCCCCCCCCCCCCCC
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Portege t110Satellite prot110

Table of Contents