Datalogic DS6100 Installation Manual page 27

Table of Contents

Advertisement

DS6100
4) After wiring the junction box and while the scanner is unplugged from the
power, place the Scanner cable so that the rubber seal fits into the cutout
in the housing of the junction box and plug the 24-pin connector into
connector J1 on the PCB inside the junction box as shown in Figure 2.11.
Scanner cable
Figure 2.11 - Scanner cable connections to the junction box
5) Close the junction box using the 4 cover screws making sure the rubber
seal is fitted correctly between the parts of the housing.
The junction box is now installed which completes the electrical connections
for your scanning system.
If it ever becomes necessary to disconnect the scanner from the junction
box, simply reverse the procedure in step 4.
2.12 - Installation
Rubber seal
DATALOGIC
J1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents