Tartup Rocedure; Heat Anticipator Setting; Drain Trap Priming; Furnace Operation - Goodman GMVC950704CX Installation Instructions Manual

Hide thumbs Also See for GMVC950704CX:
Table of Contents

Advertisement

H
A
S
EAT
NTICIPATOR
ETTING
The heat anticipator in the room thermostat must be correctly
adjusted to obtain the proper number of cycles per hour and to
prevent "overshooting" of the setting. Set the heat anticipator set-
ting to 0.7 amps. Follow the thermostat manufacturer's instruc-
tions on how to adjust the heat anticipator setting.
D
T
P
RAIN
RAP
RIMING
The drain trap must be primed prior to furnace startup. To prime, fill
the drain trap with water. This ensures proper furnace drainage
upon startup and prohibits the possibility of flue gases escaping
through the drain system.
F
O
URNACE
PERATION
Purge gas lines of air prior to startup. Be sure not purge lines into
an enclosed burner compartment.
Check for leaks using an approved chloride-free soap and water
solution, an electronic combustible gas detector, or other approved
method. Verify that all required kits (propane gas, high altitude,
etc.) have been appropriately installed.
F
S
URNACE
TARTUP
1. Close the manual gas shutoff valve external to the furnace.
2. Turn off the electrical power to the furnace.
3. Set the room thermostat to the lowest possible setting.
4. Remove the burner compartment door.
NOTE: This furnace is equipped with an ignition device which
automatically lights the burner. Do not try to light the burner by
hand.
5. Move the furnace gas valve manual control to the OFF
position.
6. Wait five minutes then smell for gas. Be sure check near
the floor as some types of gas are heavier than air.
7. If you smell gas after five minutes, immediately follow the
Safety Instructions on page 5 of this manual. If you do not
smell gas after five minutes, move the furnace gas valve
manual control to the ON position.
8. Replace the burner compartment door.
9. Open the manual gas shutoff valve external to the furnace.
10. Turn on the electrical power to the furnace.
11. Adjust the thermostat to a setting above room temperature.
12. After the burners are lit, set the thermostat to desired
temperature.
F
S
URNACE
HUTDOWN
1. Set the thermostat to the lowest setting.
The integrated control will close the gas valve and extinguish
flame. Following a 15 second delay, the induced draft blower
will be de-energized. After a 120, 150, 180 or 210-second
delay period (field selectable delay OFF [90, 120, 150, 180]
plus 30-second ramp down), the circulator blower de-
energizes.
2. Remove the burner compartment door and move the furnace
gas valve manual control to the OFF position.
3. Close the manual gas shutoff valve external to the furnace.
4. Replace the burner compartment door.
S
P
TARTUP
ROCEDURE
G
S
P
AS
UPPLY
RESSURE
T
 
 
 
O
PREVENT
UNRELIABLE
 
 
 
INLET
GAS
SUPPLY
PRESSURE
 
 
 
 
RATING
PLATE
WITH
ALL
OTHER
.
OPERATING
The line pressure supplied to the gas valve must be within the
range specified below. The supply pressure can be measured at
the gas valve inlet pressure boss or at a hose fitting installed in the
gas piping drip leg. The supply pressure must be measured with
the burners operating. To measure the gas supply pressure, use
the following procedure.
INLET
Gas Valve On/Off
Selector Switch
White-Rodgers Model 36G54 (Two-Stage)
Open to
Atmosphere
Outlet
Pressure Boss
Inlet
Pressure
Boss
White-Rodgers Model 36G54 Connected to Manometer
Regulator
Vent
Gas Valve On/Off
Selector Switch
37
& A
DJUSTMENT
M

EASUREMENT

CAUTION
 
 
 
OPERATION
OR
EQUIPMENT
DAMAGE
 
 
 
 
 
 
MUST
BE
AS
SPECIFIED
ON
THE
 
 
 
 
HOUSEHOLD
GAS
FIRED
APPLIANCES
High Fire Regulator
Adjust
Common
Terminal(C)
High Fire
Regulator
Adjust
Low Fire
Regulator
Adjust
 
THE
 
 
UNIT
 
OUTLET
Regulator
Vent
Low Fire
Regulator
Adjust

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents