Heat-N-Glo SL-950TR Installer's Manual page 46

Hide thumbs Also See for SL-950TR:
Table of Contents

Advertisement

NOTE
CAUTION
43
For Direct Spark Ignition (DSI) Wiring
This appliance requires that 110-120 VAC be wired
to the junction box included in the manual bag
assembly. Maintain correct polarity when wiring the
junction box.
The junction box is installed by sliding one tab of the
box through the slot on the lower right side of the
outer wrap and driving a screw through the other tab
into the pilot hole on the outer wrap.
Optional fan and remote control kits require that
110-120 VAC be wired to the fireplace junction box.
Position the remote wall switch in the desired position
on a wall. Run 16 A.W.G. minimum Romex wire and
connect it to the fireplace ON/OFF switch pigtails.
Electrical wiring must be installed by a licensed electrician.
LABEL ALL WIRES PRIOR TO DISCONNECTION
WHEN SERVICING CONTROLS. WIRING
ERRORS CAN CAUSE IMPROPER AND
DANGEROUS OPERATION. VERIFY PROPER
OPERATION AFTER SERVICING.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-750trsSl-550trSl-550trsSl-750tr

Table of Contents