Heat-N-Glo SL-950TR Installer's Manual page 33

Hide thumbs Also See for SL-950TR:
Table of Contents

Advertisement

Continue adding vent
components, locking
each succeeding
component into place.
If the installation is for a termination cap attached
directly to the fireplace, skip to the sections,
and
To continue adding vent components in accordance
with the pre-planned vent system configuration:
• Ensure that each succeeding vent component is
securely fitted and locked into the preceding com-
ponent in the vent system.
90° elbows may be installed and rotated to any point
around the preceding component’s vertical axis. If an
elbow does not end up in a locked position with the
preceding component, attach with a minimum of two
(2) sheet metal screws.
supported every five (5) feet of horizontal run by a
horizontal pipe support.
To install support brackets for horizontal runs:
• Place the pipe supports around the vent pipe.
• Nail the pipe supports to the framing members.
.
The vent system must be
30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-750trsSl-550trSl-550trsSl-750tr

Table of Contents