Glow-worm Swift flow 100 Installation Instructions Manual page 5

Table of Contents

Advertisement

2.1 Location
The boiler must be installed in accordance with the rules
in force in the countries of destination.
The boiler is not suitable for fitting out of doors.
Any electrical switch or boiler control using mains
electricity must be positioned so that it cannot be
touched by a person using the bath or shower.
The boiler must be mounted on a flat wall which is
sufficiently robust to take its weight, refer to Table 2.
If the boiler is to be fitted into a cupboard, compartment
or unusual location, special procedures are necessary.
Make sure that the cupboard or compartment air vents
are positioned to be clear of obstructions at all times,
refer to Section 3.
2.2 Clearances
The boiler should be positioned so that at least the
minimum operational and servicing clearances are
provided, see diagram 2.1.
Additional clearances may be required around the boiler
for installation.
For flue installations where external access is not
practicable, the clearances around the boiler may need to
be increased as follows.
For rear flue installations the dimension between the
boiler mounting wall and a permanent facing wall must
be a minimum of "X", see diagram 3.1 and 3.3, plus
272mm.
For side flue installation the dimension between any
adjacent permanent walls must be a minimum of "Y",
see diagram 3.2 and 3.4, plus 332mm.
2 B o i l e r P o s i t i o n
*
Increase to 25mm clearance from
combustible material.
Dimensions in millimetres
5
5
*
800
150
5
5
150
*
5
5
*
Diagram 2.1
221017B

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Swift flow 100 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents