marklin H0-Oberleitung User Manual page 27

Table of Contents

Advertisement

Available languages

Available languages

Step 1:
Place a positioning jig over the last mast base that has been installed on the
track. Fix this mast base in place with a positioning pin. When the first mast is
supposed to be set up, its exact location is given with the positioning jig that
has been put into position and the mast base can be screwed down on the
marked location. Using a thin screwdriver, you can drive a mounting screw for
the mast base through the corresponding hole for the positioning pin in the jig.
Important:
Please note: The inner hole
in the positioning jig is for the position of the
standard masts. The outer hole
is for the position of the tower masts.
27

Advertisement

Table of Contents
loading

Table of Contents