Table Of Contents - IDEAL Logic+ SYSTEM 15 User Manual

Table of Contents

Advertisement

IDEAL LOGIC + SYSTEM
natural Gas only
boiler size
G.C. Appliance no.
(Benchmark No.)
15
41-750-29
18
41-750-30
24
41-750-31
30
41-750-32
destination Country:
For GB, to comply with Building Regulations Part L1 (Part 6 in Scotland) the boiler should be fitted in accordance with the
manufacturer's instructions. Self-certification that the boiler has been installed to comply with Building Regulations can be
demonstrated by completing and signing the Benchmark Commissioning Checklist.
Before installing this boiler, read the Code of Practice sheet at the rear of this book.
b
oiler
Make and model ......................................................... 7
Appliance serial no. on data badge .......... Front Cover
SEDBUK No. % .......................................................... 6
Controls
Time and temperature control to heating ................. 29
Time and temperature control to hot water ........... N/A
Heating zone valves ................................................. 29
TRV's........................................................................ 11
Auto bypass ............................................................. 11
Boiler interlock .......................................................... 11
for .................................................................... all boilers
Flushing to BS.7593 ................................................. 14
Inhibitor .................................................................... 14
Central heating mode
Heat input ...................................................to be calculated
note to tHe inStAlleR: CoMPlete
tHe benCHMARK CoMMiSSioninG
CHECKLIST AND LEAVE THESE
inStRUCtionS WitH APPliAnCe
Ideal Logic + System -
Pi no.
86 CL 08
86 CL 08
86 CL 08
86 CL 08
GB, IE
benCHMARK CoMMiSSioninG CHeCKliSt detAilS
general
ContentS
Benchmark Commissioning Checklist ..................... 58
boiler Clearances ....................................................... 12
Boiler Exploded Diagram ........................................... 15
Condensate Drain .................................................. 26,27
Commissioning & testing ......................................... 32
Fault Finding .......................................................... 50-54
flue fitting .................................................................. 19
flue installation .......................................................... 10
Gas Safety Regulations ............................................... 9
Gas Supply .................................................................. 10
installation ............................................................. 15-34
Pump ........................................................................... 47
Servicing ................................................................ 35-49
Thermostatic Radiator Valves ....................................11
Water and Systems ......................................... 11,13-14
Water Connections ................................................ 12,28
Water treatment ........................................................ 14
Wiring diagram ........................................................... 31
Page
Burner operating pressure ...................................... n/a
Central heating flow temp. ...........measure and record
Central heating return temp. ........measure and record
for combination boilers only
Scale reducer ........................................................... 14
Hot water mode
Heat input ............................................to be calculated
Max. operating burner pressure .............................. n/a
Max. operating water pressure ........ measure & record
Cold water inlet temp ...................... measure & record
Hot water outlet temp. ..................... measure & record
Water flow rate at max. setting ........ measure & record
For condensing boilers only
Condensate drain ................................................ 26,27
for all boilers:
For assistance see Technical Helpline on the back page
complete, sign & hand over to customer
Page
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents