6.0 Legislation

6.1
Installation, Commissioning, Service & Repair
1. This appliance must be install in accordance with the
manufacturer's instructions and the regulations in force.
Read the instructions fully before installing or using the
appliance.
2. In GB, this must be carried out by a competent person
as stated in the Gas Safety (Installation & Use) Regulations.
3. Definition of competence: A person who works for a
Gas Safe registered company and holding current
certificates in the relevant ACS modules, is deemed
competent.
4. IN IE (Eire), this must be carried out by a competent
person as stated in I.S. 813 "Domestic Gas Installations".
Lifting - This product should be lifted and handled by two
people. Stooping should be avoided and protective
equipment worn where necessary. Carrying & lifting
equipment should be used as required, e.g. when installing
in a loft space.
All Gas Safe registered engineers carry an ID card with their
licence number and a photograph. You can check your
engineer is registered by telephoning 0800 408 5500 or
online at www.gassaferegistered.co.uk
The boiler meets the requirements of Statutory Instrument
"The Boiler (Efficiency) Regulations 1993 No 3083" and is
deemed to meet the requirements of Directive 92/42/EEC
on the energy efficiency requirements for new hot water
boilers fired with liquid or gaseous fuels:-
Type test for purpose of Regulation 5 certified by:
Notified Body 0085.
Product/Production certified by:
Notified Body 0086.
For GB/IE only.
6.2
Benchmark Commissioning Checklist
Please ensure that the installer has fully completed the
Benchmark Checklist on the inside back pages of the
installation instructions supplied with the product and that
you have signed it to say that you have received a full and
clear explanation of its operation. The installer is legally
required to complete a commissioning checklist as a
means of complying with the appropriate Building
Regulations (England and Wales).
All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate will
then be issued to the customer who should, on receipt,
write the Notification Number on the Benchmark Checklist.
This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer
should complete the relevant Service Record on the
Benchmark Checklist after each service.
The Benchmark Checklist may be required in the event of
any warranty work.