UNPACKING THE APPLIANCE

5
B
C
E
6
H
D
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
UNPACKING THE APPLIANCE
UNPACKING THE APPLIANCE
A - Outer carton
B - Inner sleeve (unwraps from front)
C - Packaging base
D - Protective wrapping
E - Appliance outer case
4. Remove outer carton (A) and place
safely away from the working area.
5. With the outer packaging removed and
the inner sleeve (B) still in place gently
lay the boiler on its back.
6. The boiler will lie at an angle to the
floor to allow the boiler outer casing (E)
to be removed. The inner sleeve (B)
opens as shown. Remove the protective
wrapping (D) and undo the four screws,
6.2
two at the bottom of the boiler (H) and
two at the top (H) (see diagrams 6.1 and
6.2). Remove any packaging within the
boiler and the packaging base (C).
CAUTION: Caps fitted to pipes must be
removed before hanging the boiler.