Worcester GREENSTAR 12i Instruction Manual page 69

Installation, commissioning & servicing wall hung rsf gas fired condensing boiler
Hide thumbs Also See for GREENSTAR 12i:
Table of Contents

Advertisement

1
1
A
C
22mm
22mm
2
F
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167b (03/2009)
A
D
A
C
B
D
D
B
15mm
22mm
Condensate pipe
PRE-COMMISSIONING
B
CHECKS
CAUTION: ISOLATE THE MAINS
SUPPLIES BEFORE STARTING ANY
WORK AND OBSERVE ALL
RELEVANT SAFETY PRECAUTIONS
1 Check that the service and water pipes are
2 Check the gas type specified on the
3 Check that the condensate pipe has been
4 Check pressure relief drain pipe (H) is
H
IMPORTANT: If the boiler is not to be
commissioned immediately then:
after successfully completing all of the
checks and any rectification work,
close the gas and water valves, shut off
the gas supply, electrically isolate the
boiler and label appropriately.
NOW R ETU R N TO TH E MAIN
I N STR UC TION S
( F I LLI NG TH E SYSTE M ) TO
CONTINUE INSTALLATION.
3
Preplumbing manifold
connector
connected to the correct position on the
manifold.
A - Flow (22mm)
B - CH Return (22mm)
C - Gas inlet (22mm)
D - Cylinder Return (15mm)
identification plate (F) matches that of the
gas supply. Turn on the main gas supply,
check the gas pipework, connections and
rectify any leaks.
connected to the syphon.
correctly fitted and securely tightened.
PAG E
4
PRE- COMMISSIONING CHECKS
32
H
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24i

Table of Contents