Wall Mounting Template & Flue Opening; Unpacking The Appliance - Worcester Greenstar CDi Compact Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing combination boiler
Table of Contents

Advertisement

INSTALLATION
is used make sure the outer carton is not pierced and that the
implement is used in such a way so that it may not cause personal
injury.
• All sharp objects must be covered or the blade retracted after use and
put away in a safe place.
Care should be taken when lifting the boiler from the base and the
proper technique for safe lifting of any heavy object should be strictly
observed.
Additional requirements for roof space installation:
• The boiler should be first unpacked before ascending ladder to a loft
space.
• Two sets of steps should be used.
• Two people should share the lifting of the boiler up to the loft hatch,
where the boiler is entered into the loft space tilted and slid on its back
into the loft.
• Once the appliance is removed from its packaging check the contents
against the packing list.
NOTICE:
▶ Before installing the appliance, ensure that the
system has been cleaned as explained on page 9.
4.2
WALL MOUNTING TEMPLATE & FLUE OPENING
WARNING: BEFORE DRILLING
ENSURE THAT THERE ARE NO PIPES, ELECTRICAL
CABLES, DAMP PROOF COURSES OR OTHER
HAZARDS.
SAFETY:
All relevant safety precautions must be undertaken. Protective clothing,
footwear, gloves and safety goggles must be worn as appropriate.
FIXING THE WALL MOUNTING FRAME:
▶ The boiler wall mounting template shows the relative positions of the
flue and the top and bottom fixing points of the wall mounting frame.
1. Fix the wall mounting template to the wall in the desired position.
2. Drill 4 holes for the wall mounting frame through the template,
additional mounting holes can be utilised if required.
The wall mounting template has been sized to allow for
minimum clearances of 5mm sides, 200mm base and
170mm above boiler case (which is 30mm above a
100mm diameter flue elbow).
REAR FLUE OUTLET
▶ The drawing opposite shows the boiler wall mounting template with
the flue centre lines of both the
100mm and 125mm flue systems.
3. Mark the centre line of the flue to be used (3); the external diameter of
the hole can also be marked if required.
▶ If a 100mm diameter flue is to be used, a 125mm diameter hole is
required. However, if using the weather sealing collar by pushing it
through from inside the property, then a 150mm diameter hole is
required to accommodate this.
▶ The flue turret of the 100mm flue has an in-built 3° angle.
▶ If extensions are to be added then the complete flue must rise at an
angle of 3°.
▶ Drill the hole, preferably using a core drill.
SIDE OUTLET:
4. Mark from the centre line of the wall mounting template to the wall
that the flue will pass through (4).
▶ Allow for a rise of 52mm per metre length of flue, to give a 3° angle.
20
▶ Clear any debris from the site.
4.
Fig. 22 Marking the flue position
▶ Remove wall mounting template.
▶ Secure the wall mounting frame to the wall with the appropriate
fittings for the boiler weight and wall type.
▶ Remove and discard the red plastic dust cap from the expansion
vessel pipe before hanging the boiler.
4.3

UNPACKING THE APPLIANCE

1. Remove outer carton (1) and place safely away from the working area.
2. Remove the inner sleeve (3) leaving all other cardboard inserts and
base (4) in place.
3. Remove the protective wrapping (5) from the boiler.
1.
Fig. 23 Remove the carton
3.
1.
2.
3.
1
5
2.
2
2
3
4
6 720 803 800 (2012/11)