Worcester GREENSTAR 12i Instruction Manual page 41

Installation, commissioning & servicing wall hung rsf gas fired condensing boiler
Hide thumbs Also See for GREENSTAR 12i:
Table of Contents

Advertisement

INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
8 716 115 167b (03/2009)
INSPECTION AND SERVICE
5
H
4
Remove electrical connector from fan.
5
Undo and remove securing nut (H) from the
top of the heat exchanger.
6
Remove retaining plate (I).
7
Rotate fan and air/gas manifold assembly (J)
around the top of the heat exchanger until it
stops at the lug.
Lift up assembly and remove from boiler.
8
Disconnect spark electrode and flame sensor
6
connections (K).
Remove clamping plate (L).
Remove spark/flame electrode assembly
I
from boiler.
Remove seal from the top of the heat
exchanger.
4
INSPECTION AND SERVICE
8
L
K
7
J
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24i

Table of Contents