Worcester GREENSTAR 12i Instruction Manual page 38

Installation, commissioning & servicing wall hung rsf gas fired condensing boiler
Hide thumbs Also See for GREENSTAR 12i:
Table of Contents

Advertisement

38
INSPECTION AND SERVICE
.
1
A
C
1.1
B
2.1
2.2
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR 12i/24i System
INSPECTION AND SERVICE
1.2
Component Access
1. Removing outer case
1.
Remove bottom panel by pulling it forward
and off.
1.1 Undo and remove 2 screws (A) securing
boiler casing at the top of the appliance.
1.2 Undo but do not remove the 2 screws
(B) securing boiler casing at the bottom of
the appliance.
1.3
1.3 Pull case forward and remove.
2. Lowering boiler control to
service position
2.1 Remove screw (C) securing control.
2.2 Gently pull forward until it comes to
rest in service position.
8 716 115 167b (03/2009)
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24i

Table of Contents