9-1-4. ADDITION OF REFRIGERANT
• Additional charging is not necessary if the pipe length does not exceed 20 m(70 ft) for A12-A36 or 30 m(100 ft) for A42.
• If the pipe length exceeds the specified length above, charge the unit with additional R410A refrigerant according to the
permitted pipe lengths in the chart below.
* When the unit is stopped, charge the unit with the additional refrigerant through the liquid stop valve after the pipe
extensions and indoor unit have been vacuumized.
* When the unit is operating, add refrigerant to the gas check valve using a safety charger. Do not add liquid refrigerant
directly to the check valve.
* After charging the unit with refrigerant, note the added refrigerant amount on the service label (attached to the unit).
• Be careful when installing multiple units. Connecting to an incorrect indoor unit can lead to abnormally high pressure and have
a serious effect on operation performance.
Max. pipe
Model
length
A12, A18
30 m, 100 ft
A24, A30, A36
50 m, 165 ft
A42
50 m, 16 5 ft
68
Max. height
20 m
25 m
difference
70 ft
80 ft
0.06 kg
30 m, 100 ft
0
2 oz
0.17 kg
30 m, 100 ft
0
6 oz
30 m, 100 ft
0
0
Additional refrigerant charging amount (kg/oz)
27 m
30 m
33.5 m
36.6 m
90 ft
100 ft
110 ft
120 ft
0.11 kg 0.17 kg
4 oz
6 oz
0.34 kg
0.51 kg 0.68 kg
0.85 kg
12 oz
18 oz
24 oz
30 oz
0.17 kg
0.34 kg
0
0
6 oz
12 oz
40 m
43 m
45.5 m
48.8 m
130 ft
140 ft
150 ft
160 ft
1.02 kg
1.19 kg 1.36 kg
1.53 kg
36 oz
42 oz
48 oz
54 oz
0.51 kg
0.68 kg 0.85 kg
1.02 kg
18 oz
24 oz
30 oz
36 oz
50 m
165 ft
1.70 kg
60 oz
1.19 kg
42 oz