  • Page 1 BigIR - MK IV Vertical - Instruction Manual VU7LD—Laccadive ON8DS OY9R BS7S—Scarborough Reef 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415 Revision 4 11/1/11...
  • Page 2: Table Of Contents

    More about choosing radial systems for ground / above-ground installations 21-25 Using a vertical in or on salt water DB25 control cable splice assembly instructions Control cable wiring schematic SteppIR Warranty 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 3: Steppir - Why Compromise

    SteppIR to be a commercially feasible product. The current and future SteppIR products should produce the most potent single tower antenna systems ever seen in Amateur Radio! We thank you for using our SteppIR antenna for your ham radio endeavors.
  • Page 4: Steppir Design

    Currently, most multi-band antennas use traps, log cells or interlaced elements as a means to cover several fre- quency bands. All of these methods have one thing in common–they significantly compromise performance. The SteppIR™ antenna system is our answer to the problem. Resonant antennas must be made a specific length to operate optimally on a given frequency.
  • Page 5: Bigir Vertical Components

    EHT tube and the second EST goes on to the end of the first section. (Figure 7 and Figure 9 on next page) Warning: Be certain that the metal coupler on the extension ESTs firmly bottom out. Figure 3 Figure 5 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 6: Installation Of Rain Cap

    Warning: Press the cap on approximately 1-1/8” (Figure 20). Do NOT press the cap down so hard as to crimp (damage) the cross tube preventing the pole from properly venting. Rain Cap & Vent Figure 19 1.125 Figure 20 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 7: Installing The Element Support Extension Tubes

    BigIR EST Extension Tube Instructions FIGURE A 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 8: Polyolefin Heat Shrink Procedure

    Each line needs to change in color to ensure even adhesion temperatures. With this change, there is no longer any need to tape the joints on the loop elements. 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 9: Securing The Telescoping Pole To The Element Support Tube (Est) Extension

    Figure 21 tenna to the tower, to be sure that there has been no cold flowing of the PVC material on the rubber boot. 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 10: Element Housing Unit (Ehu) Wiring Instructions

    Element Housing Unit (EHU) Wiring Instructions 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 11 BigIR vertical. The pictures below show the completed wind reinforcing kit installation. BigIR Wind Reinforcing Kit BigIR Wind Reinforcing Kit without 80m coil with 80m coil 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 12 Additional hardware included for BigIR with the 80m coil: Part Number Description 60-0095 #10 x 2” Pan head bolt 10-1004-02 0.562” Plastic spacer 10-1613-11 1/4” x 5/16” Aluminum spacer 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 13: Wind Reinforcing Kit Installation Instructions

    WARNING: Plug the bottom, non Qty 1: 10-1021-52 Qty 2: 10-1613-11 gasketed side of this drain with Wind reinforcing plate 1/4” Aluminum spacer the included coax-seal. 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 14 80m coil, the four pan head bolts used to secure the coil to the EHU are 2” Figure 8.2 Figure 8.3 Figure 8.5 Figure 8.4 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 15 Slide the quick disconnect boot up to the EST and tighten both sides firmly. Wait 15 min- utes and retighten. Figure 8.9 shows the completed wind reinforcing assembly. Figure 8.7 Figure 8.6 Figure 8.9 Figure 8.8 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 16: Installing The Optional 80M Coil

    Figure 8.13 shows the completed wind reinforcing assembly installation. • Follow the rest of the BigIR installation guide for connecting the 80m coil to the BigIR. Figure 8.10 Figure 8.13 Figure 8.12 Figure 8.11 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 17: Ground Mounting Of The Bigir Vertical

    4 wires per set (ground radials), all sol- Figure 28—Ground radials dered and crimped to a lug connector. Figure 31 Figure 29 8 to Figure 33 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 18: Recommended Radials For Ground And Above Ground Installations

    Figure 41 ratings Anchor Anchor Figure 36 Figure 39 Mounting Tube Flexible Ground Coupler 8 to in . 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 19 Control Cable and the Coax do not touch each other, this can cause the wires to arc and it will damage the Antenna. 4 Nylon Spacers 4 SS bolts with Figure 47 Figure 45 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 20: Installing The Optional 1:1 Balun

    PL-259 as shown in Figure 27. Your feed line will then plug into the SO-239 in the center of the balun. Optional External Balun Figure 27 Figure 25 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 21: More About Choosing Radial Systems For Ground / Above-Ground Installations

    Eight to twelve 0.1 wavelength radials gives strength 60% - 65% efficiency (one set of 8 - 12 ra- dials cut to 0.1 wavelength at lowest fre- quency) 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 22 4. If you have very good earth (very few of us actually do), you can obtain good performance with very few radials. Graph 1 Number of Radials Number of radials 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 23 0.48 0.32 0.24 0.16 0.08 Graph 3 Number of Radials (N) Number of radials 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 24 Antenna Impedance 0° 22 Ohms 10° 28 ohms 20° 35 ohms 30° 47 ohms 40° 53 ohms 50° 55 ohms Note: above 50° results in diminishing returns 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 25: Using A Vertical In Or On Salt Water

    When using a small metal float (3 ft x 3 ft is just enough to “connect” to salt water), you want to be certain that the metal does not corrode over time. For long term immersion, Monel is a good (but fairly expensive ) choice. 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 26: Db25 Control Cable Splice Assembly Instructions

    DB 18 Control Cable Splice Assembly Instructions 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 27: Control Cable Wiring Schematic

    Wiring Diagram- DB25 Cable Splice 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...
  • Page 28: Steppir Warranty

    If you need to return your antenna for repair, please go to www.steppir.com, fill out the Re- turn for Repair form, print a copy and put it into the package that you send back to SteppIR. STEPPIR ANTENNAS LIMITED PRODUCT WARRANTY Our products have a limited warranty against manufacturers defects in materials or construction for two (2) years from date of shipment.
  • Page 30 2112 116TH AVE NE SUITE 1-5, BELLEVUE WA, 98004 WWW.STEPPIR.COM TEL: (425)-453-1910 FAX: (425)-462-4415...