Power Down The Server Blade; Remove The Server Blade - HP ProLiant BL480c Maintenance And Service Manual

Hide thumbs Also See for ProLiant BL480c:
Table of Contents

Advertisement

Power down the server blade

Before powering down the server blade for any upgrade or maintenance procedures, perform a backup
of critical server data and programs.
Depending on the Onboard Administrator configuration, use one of the following methods to power down
the server blade:
Use a virtual power button selection through iLO 2.
This method initiates a controlled remote shutdown of applications and the OS before the server
blade enters standby mode.
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server blade
enters standby mode.
Press and hold the Power On/Standby button for more than 4 seconds to force the server blade to
shut down.
This method forces the server blade to enter standby mode without properly exiting applications and
the OS. It provides an emergency shutdown method in the event of a hung application.
IMPORTANT:
provided. To remove all power from the server blade, remove the server blade from the
enclosure.
After initiating a virtual power down command, be sure that the server blade goes into standby mode by
observing that the system power LED is amber.

Remove the server blade

Identify the proper server blade.
1.
Power down the server blade (on page 24).
2.
Remove the server blade.
3.
Place the server blade on a flat, level work surface.
4.
When the server blade is in standby mode, auxiliary power is still being
Removal and replacement procedures 24

Advertisement

Table of Contents
loading

Table of Contents