Auxiliary Pto; Bilge Pump – Relief Bore Check - MTU 16 V 4000 M63L Operating Instructions Manual

Table of Contents

Advertisement

6.19 Auxiliary PTO

6.19.1 Bilge pump – Relief bore check
DANGER
Rotating and moving engine parts.
Risk of crushing, danger of parts of the body being caught or pulled in!
• Only run the engine at low power. Keep away from the engine's danger zone.
WARNING
High level of engine noise when the engine is running.
Risk of damage to hearing!
• Wear ear protectors.
Bilge pump – Relief bore check
1.
Check relief bores for oil and water dis-
charge.
2.
Stop engine (→ Page 61) and disable en-
gine start.
3.
Clean relief bores with a wire if dirty.
• Permissible water discharge: up to 10
drops per hour;
• Permissible oil discharge: up to 5 drops
per hour
4.
If discharge exceeds the specified limits:
Contact Service.
226 | Task Description | MS150067/02E 2014-04

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents