Section 12 - Cowling Installation - Hangar 9 Extra 260 Assembly Manual

Hide thumbs Also See for Extra 260:
Table of Contents

Advertisement

Section 12 – Cowling Installation
Required Parts
• Fuselage assembly
• #4 washer (4)
• 4-40 x 1" socket head screw (4)
Required Tools and Adhesives
• Rotary tool with sanding drum
• 3
1
/
" spinner and adapters
4
Step 1
Use cardstock to indicate the location of the
engine, needle valve, firewall and any other engine
related items that will need to be accessed with
the cowling on.
Step 2
Attach the cowling onto the fuselage using four
4-40 x 1" socket head screws, four #4 washers and
four pieces of 1/4" long fuel tubing. Transfer the
positions from the cardstock onto the cowling.
• Cowling
• 1/4" fuel tube (4)
Step 3
Remove the cowl from the fuselage. Use a rotary tool
and sanding drum to remove material to allow access
to items such as needle valves, glow plugs, cut-off
switches, mufflers, etc.
Note: Start by removing only a little material
at a time. You can always make the holes
bigger as you work. Work until the cowl fits
nicely over the engine.
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents