Electrical Work - Samsung APV48Q0AN Installation Manual

Hide thumbs Also See for APV48Q0AN:
Table of Contents

Advertisement

ELECTRICAL WORK

The electrical work should be performed by a specialist qualified for the work.
Use the three phase power supply, and be sure to install the sub power distributing board for
exclusive use with the unit(separately purchased by the user).
Do not connect multiple plugs to an outlet at once because it can cause a drop in voltage,
resulting in poor performance of the automatic control circuit.
Be sure to install circuit breaker (Extra purchased by the user).
Be sure to connect the grounding wire.
Electric power specification
Model
Power
Ampere of breaker
Knife switch
Switch
Fuse
Size of grounding wire
Min. size of electric wires from/to
the indoor/outdoor unit
Size of electric input wires
CAUTION
Be sure to use the wires, and switches or fuses of power distribution board are qualified and fulfill
the specifications.
Be sure to install knife switch or circuit breaker on the power distribution board.
The electrical and grounding work should be performed as per 'technical specifications of
electrical facilities' and 'specifications of internal wiring'.
Be sure to connect the main electrical input wires with bolted connectors using compressed terminal.
6
E-
141 Kinderkamack Rd, Park Ridge, NJ 07656 Tel: 201-782-1782 Fax: 201-782-1783 Web: www.amgair.com Email: info@amgair.com
APV48Q0AN
1ø, 208~230V, 60Hz
50 A
30 A
30 A
2.0mm
0.75mm
4mm
Air Marketing Group LLC
2
2
2

Advertisement

Table of Contents
loading

Table of Contents