ELECTRICAL WORK
The electrical work should be performed by a specialist qualified for the work.
Use the three phase power supply, and be sure to install the sub power distributing board for
exclusive use with the unit(separately purchased by the user).
Avoid octopus-type wiring as it can cause a drop in voltage, thus resulting in poor performance
of the automatic control circuit.
Be sure to install circuit breaker (separately purchased by the user).
Be sure to connect the grounding wire.
Electric power spec
ITEM
Model
Power
Sub switch
Electric wire
Allowable voltage
SPEC
APC4082E/APC4082EC
Single phase 220-240V, 50Hz
50A
4.0mm
2
(separately purchased by the user)
198V~264V
5
E-