INSTALLATION METHOD

Installation Procedures

1. Open the front panel, and remove the flare nut.
2. Bend the connection pipe to an appropriate length using the spring bender depending
upon the installation place.
- Allowable pipe length : Maximum 75m
- Allowable pipe drop distance : Maximum 30m
- Make no more than ten bending points on the pipe.
When the pipe length is in excess of the standard pipe length of 7.5m, add the refrigerant (R410A) of
40g for each additional 1m.
Additional Refrigerant
For example : 15m pipe length, additional refrigerant to be charged is (15m-7.5m) 40g/m=300g
CAUTION
If the pipe is lengthened, the performance of the unit is degraded, and the service life is shortened.
Therefore, the pipe length should be as short as possible (less than 25m).
Outdoor
3. Install the high pressure pipe to the heat exchanger liquid pipe, and the low pressure pipe to the
heat exchanger gas pipe respectively using the flare nut, taking care not to cause any leakage of refrigerant.
4. Be sure to insulate the pipe with appropriate insulation material.
5. Insert the drain hose into the drain pipe, and connect them by tying them to the cable tie to prevent
any water leakage.
6. After completion of the installation, check the connecting area for any gas leakage.
7. Wind a finish tape when the wiring of the refrigerant pipe, the unit, and the drain piping are completed.
141 Kinderkamack Rd, Park Ridge, NJ 07656 Tel: 201-782-1782 Fax: 201-782-1783 Web: www.amgair.com Email: info@amgair.com
Indoor unit
unit
Indoor unit
checking area
Outdoor
unit
Indoor unit
Outdoor unit
checking area
Air Marketing Group LLC
Indoor unit
Fix the pipe
(Every 6m)
Fix the pipe
Outdoor
unit
S-TRAP
9
E-

Advertisement

Table of Contents
loading

Table of Contents