Hanging Assembly; Floor Fastening - Telair Energy 4010D Use And Maintenance Manual And Instructions For Installation

Hide thumbs Also See for Energy 4010D:
Table of Contents

Advertisement

4.2.1 Hanging assembly

The generator, when sticking out of the package,
is preset for hanging assembly, as shown in fig.
5.
The package also contains 4 vibration-damping
cylinders (fig. 6 ref.1) and 2 brackets for hanging
assembly (fig. 6 ref. 2).
cylinders must imperatively be fitted as
shown in fig. 6. They must be pressed, and
NOT extended (as shown in fig. 7) by the
generator weight.
8
The vibration-damping
Energy 4010 D
GB

4.2.2 Floor fastening

The package contains a drilling jig, which allows
the generator bearing surface to be prepared
quickly, fig. 8.
resistant gasket around the outlet opening of
the exhaust pipe. The gasket height must
reach the bottom of the generator and has the
purpose of preventing hot air from spreading
inside the generator compartment.
The brackets of the generator must be moved in
order to fasten the Energy 4010D on the bearing
surface.
On both sides, remove the hole plugs (fig. 9 ref.
1) and screw out the screws (fig. 9 ref. 2) in order
to remove the bracket (fig. 9 ref. 3).
Place a spongy, heat-
Vers. 001

Advertisement

Table of Contents
loading

Table of Contents