IBM eserver xSeries 232 8668 Hardware Maintenance Manual page 62

Hide thumbs Also See for eserver xSeries 232 8668:
Table of Contents

Advertisement

Installing internal drives
Preinstallation steps (all bays)
Before you install drives in your server, verify that you have all the cables and any
other equipment specified in the documentation that comes with the internal drive.
You might also need to perform certain preinstallation activities. Some of the steps
are required only during the initial installation of an option.
1. Read "Important safety information" on page v, "Handling static-sensitive
2. Choose the bay in which you want to install the drive.
3. Check the instructions that come with the drive to see if you need to set any
4. To install the drive, go to "Installing a hot-swap drive" on page 55 or to
54
Hardware Maintenance Manual: Type 8668
devices" on page 42, and the documentation that comes with your drive.
switches or jumpers on the drive.
"Installing a non-hot-swap drive" on page 57, as appropriate.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents