Configuration For Communication With Gx Iec Developer - Mitsubishi Electric MR-J3-T Quick Start Manual

Servo amplifier with point table positioning
Hide thumbs Also See for MR-J3-T:
Table of Contents

Advertisement

Positioning via a CC-Link Network
5.2.2

Configuration for communication with GX IEC Developer

Generally, positioning control is performed via a CC-Link network in applications where an addi-
tional PLC system is used for automation tasks as well as the integrated controller in the ampli-
fier. In this example we will thus only provide detailed descriptions of the settings required to
integrate the servo amplifier in your project.
Procedure:
How to open an existing project in GX IEC Developer:
Select Network
Select CC-Link
This opens the window Network parameters: Setting the CC-Link list where you can now
enter the settings shown in Fig. 5-6
Fig. 5-6:
MR-J3-T
in the project directory tree in the left window.
in the Network Parameter box.
Settings required in GX IEC Developer for CC-Link communication between
the controller and the servo amplifier
CC-Link Communication Settings
.
(a)
(b)
(c)
5 - 35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents