Way Valve Function Test - Invacare Perfecto 2 SeriesIRC5PO2AW Service Manual

Homefill compatible
Table of Contents

Advertisement

SECTION 23—LEAK TEST

4 Way Valve Function Test

NOTE: For this procedure, refer to FIGURE 23.1 on page 83.
The 4-way valve used in the Perfecto
tolerance of leakage per RexRoth
By nature of the valve design it is possible for the valve to experience small leaks, and still
operate without affecting the overall performance of the unit. The valve is assembled
where the components that make up the valve "Snap" together. The only screws in the
valve are for securing the valve to the manifold assembly.
According to RexRoth there is an acceptable leak specification of 60 cc per minute at
137.89 kPa (20 p.s.i.) on each valve. Valves that have leaks within this specification will
function properly without any adverse effects to the performance of the concentrator. A
leak in the amount of 60 cc or less would be indicative of the type of small leak you would
notice where the end caps connect to the main body or where the three pieces of the main
body connect together. A 60 cc leak would not be noticeable when examining the system
pressure swings.
Leaks greater than 60 cc are indicative of cracks in the end caps, or a blown seal where the
end cap connects to the main body of the valve. These leaks are detected by either reading
the system swing pressures, noticing two consecutive swings not being equal or by
hearing an audible leak every other cycle. Leaks of this extreme nature indicate the valve
needs to be replaced.
Valves should only need to be replaced when the following conditions exist:
1. A visible crack is noted on either of the end caps or main body of the 4 way valve,
regardless of the amount of leak.
2. A large leak is present on the valve that causes an imbalance in the sieve bed swing
pressures. Example: Sieve Bed 1 pressure swings from 96.52 kPa (14 p.s.i.) to 110.32
kPa (16 p.s.i.), within 7-20 seconds and Sieve Bed 2 pressure swings from 89.63 kPa (13
p.s.i.) to 110.32 kPa (16 p.s.i.) slowly, and may take as long as 25-30 seconds before
shifting (times over 30 second will shut down automatically).
3. Valve will not shift and the pilot valve solenoid and circuit board are working
properly.
NOTE: The concentrator's P.C.B. should exhibit an error code for High Pressure Failure (1 RED/
2 GREEN).
NOTE: The best method to test the 4-way valve operation is by measuring the unit pressure
swings. Refer to Checking Sieve Bed Pressure (Model IRC5PO2AW Only) on page 91 or Checking
Sieve Bed Pressure (Model IRC5PO2VAW Only) on page 93.
Perfecto
2
Series Concentrators does have an acceptable
2
®
.
84
Part No 1154245

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irc5po2vaw

Table of Contents