Finishing; Hearth Extension - Heat-N-Glo SL-950TR Installer's Manual

Hide thumbs Also See for SL-950TR:
Table of Contents

Advertisement

Step 9. Finishing
!
6"
5"
4"
3"
2"
1”
3"
2"
1”
TOP FRONT EDGE
OF FIREPLACE
CEILING
12"
11"
10"
9"
31"
8"
7"
12"
11"
10"
9"
8"
7"
6"
5"
4"
CAUTION: IF JOINTS BETWEEN THE FINISHED WALLS
AND THE FIREPLACE SURROUND (TOP AND SIDES)
ARE SEALED, A 300° F. MINIMUM SEALANT MATE-
RIAL MUST BE USED. THESE JOINTS ARE NOT RE-
QUIRED TO BE SEALED. ONLY NON-COMBUSTIBLE
MATERIAL (USING 300° F. MINIMUM ADHESIVE, IF
NEEDED) CAN BE APPLIED AS FACING TO THE FIRE-
PLACE SURROUND. SEE THE DIAGRAM BELOW.
TOP SEAL JOINT
SIDE JOINT
1/2"
49
FINISH MATERIAL
CAN BE DRYWALL
- TOP AND SIDES
OF UNIT
1/2"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-750trflSl-750trSl-550trSl-750trsSl-550trs

Table of Contents