Installation Guide for the Model FE508 and FE516 Fast Ethernet Hubs

Verifying Your Installation

When installation is complete and power has been applied to the hub, the following conditions should
exist:
Power LED on the front panel is on.
Link LED on each connected port should be on.
Data LED on the front panel is blinking when data is being received by any port in the hub and
the Data LED on the connected port is blinking when data is being received by that port.
On a single hub, the Terminator LED on the rear panel is on.
In a stack of hubs, the Terminator LEDs on the top and bottom hubs are on. The Terminator LED
on the middle hub(s) is off.
If there are any problems, refer to Chapter 4, "Troubleshooting."