Verifying Installation; Figure 4-2. Connecting To The Model Gs508T Switch - NETGEAR GS508T Installation Manual

8 port 10/100/1000 mbps copper gigabit switch
Table of Contents

Advertisement

Key
1000 Mbps
100 Mbps

Figure 4-2. Connecting to the Model GS508T Switch

Verifying Installation

When power has been applied to the switch, verify that:
• The green power LED on the front panel is on.
• The green link LED on each connected port is on.
When the switch is connected and operating, refer to Table 2-1 "LED Descriptions"
for information about the LEDs and their activity.
9330FB
installation
4-3

Advertisement

Table of Contents
loading

Table of Contents