Verifying Installation; Figure 4-2. Connecting To The Model Gs524T Switch - NETGEAR GS524T - ProSafe Switch Installation Manual

24 port 10/100/1000 mbps copper gigabit switch
Hide thumbs Also See for GS524T - ProSafe Switch:
Table of Contents

Advertisement

Refer to Figure 4-2 when connecting the switch.
Key
1000 Mbps
100 Mbps
10 Mbps

Figure 4-2. Connecting to the Model GS524T Switch

Verifying Installation

When power has been applied to the switch, verify that:
• The green power LED on the front panel is on.
• The green link LED on each connected port is on.
When the switch is connected and operating, refer to Table 2-1 "LED Descriptions"
for information about the LEDs and their activity.
installation
4-3

Advertisement

Table of Contents
loading

Table of Contents