Installing Optional Reel-Type Wire; Section 3 - Operation; Safety Equipment - Miller Electric A.B.B. Robot Interface Gas Control Hub And Spindle Owner's Manual

A.b.b. robot interface gas control hub and spindle
Table of Contents

Advertisement

2-14. Installing Optional Reel-Type Wire

1
2
Unlocked

3-1. Safety Equipment

3
4
3
4
5
6
Wire Installation
SECTION 3 – OPERATION
1
2
1
2
3
4
5
6
7
5
Remove retaining ring. Pull lock
and turn. Remove spanner nut, wire
retainer, and wire reel from hub.
6
To install wire lay wire reel on flat
surface and install wire as shown.
Tighten spanner nut until lock is in
position over hole in wire retainer.
Pull lock and turn to insert locking
pin into wire retainer.
Slide wire reel assembly onto hub.
7
Turn assembly until hub pin is
seated in hole in reel. Reinstall
retaining ring.
ST-161 000-A / ST-152 463 / Ref. ST-157 999-A
Wear the following while welding:
1
2
3
3
Retaining Ring
Lock
Spanner Nut
Wire Retainer
Welding Wire
Wire Reel
Hub
Dry, Insulating Gloves
Safety Glasses With Side
Shields
Welding Helmet With Correct
Shade Of Filter (See ANSI
Z49.1)
sb3.1 1/94
OM-884 Page 17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the A.B.B. Robot Interface Gas Control Hub And Spindle and is the answer not in the manual?

Table of Contents