Quincy Compressor QED 650 Instruction And Maintenance Manual page 66

Refrigerant compressed air dryers
Hide thumbs Also See for QED 650:
Table of Contents

Advertisement

Instruction book
Overview
Text on figure
(1)
(2)
(3)
Example for service level (A):
The figures at the left are the programmed service intervals. For Service interval A, the programmed number
of running hours is 4000 hours (upper row, green) and the programmed number of real time hours is 4000
hours, which corresponds to six months (second row, blue). This means that the controller will launch a service
warning when either 4000 running hours or 4000 real hours are reached, whichever comes first. Note that the
real time hours counter keeps counting, also when the controller is not powered.
The figures at the right are the number of hours to go till the next service intervention. In the example above,
the compressor was just started up, which means it still has 4000 running hours or 3976 real time hours to go
before the next Service intervention.
Service plans
A number of service operations are grouped (called Level A, Level B, etc...). Each level stands for a number
of service actions to be carried out at the time intervals programmed in the electronic controller.
When a service plan interval is reached, a message will appear on the screen.
After carrying out the service actions related to the indicated levels, the timers must be reset.
From the Service menu above, select Service plan (3) and press Enter. Following screen appears:
2920 1818 00
Overview
Running Hours (green)
Real Time hours (blue)
65

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qed 1050Qed 850

Table of Contents