▶ Slowly open the gas valve by pushing on the gas valve and turning it
¼ rotation in an anticlockwise direction. The gas valve is open when
it is in the vertical position.
Fig. 79 Open the gas valve
▶ Switch off the power supply to the heating system.
ON
OFF
Fig. 80 Switch off the power supply to the heating system
▶ Check the new pipe section up to and including its connection (i.e.
direct sealing location) to the gas fitting for leaks, using a foaming
product. The maximum test pressure allowed at the gas valve inlet is
150 mbar.

10.2.2 Bleeding the gas flow pipe

▶ Close the gas valve.
Fig. 81 Closing the gas valve
▶ Open the screw plug on the testing nipple of the gas supply pressure
and for purging [1] by 2 turns and install a hose.
6720813171 (2015/04)
▶ Slowly open the gas valve by pushing on the gas valve and turning it
anticlockwise through ¼ rotation ( fig. 85, page 58). The gas valve
is open when it is in the vertical position.
▶ Purge the gas supply into a well ventilated area.
▶ Close the gas shut-off valve when no more air is present (fig. 87).
▶ Remove the hose and tighten the screw plug on the testing nipple
again.
GB162-50/65
6 720 648 726-079.1TD
GB162-80/100
6 720 648 726-080.1TD
Fig. 82 Bleeding the gas flow pipe

10.2.3 Gas consumption test

▶ Isolate all other appliances.
▶ Set the boiler to full load.
▶ Ensure that there is no modulating of the fan gas valve by operating
the test mode.
6 720 648 726-081.1TD
▶ Carry out the gas consumption procedure as described in the latest
edition of the Essential Gas Safety book.
NOTICE:
▶ Test the tightness of the measuring nipple(s) used.
Commissioning
6720813171-2.1TD
39