Worcester GB162-50 Installation And Servicing Instructions page 13

Commercial
Table of Contents

Advertisement

550
Fig. 7
Dimensions and connections
1) The pump group is an accessory which has to be ordered separately.
[CDO]
Condensate drain outlet; Ø 24 mm O/D
[CHF]
CH (boiler) flow; G1½" union nut with female thread
[CHR]
CH (boiler) return; G1½" union nut with female thread
[CS]
Cap (DO NOT remove)
[FGC/AIC] Flue gas/air intake connection: Ø 80/125 for GB162-50/65 and Ø 100/150 for GB162-80/100
[GAS B]
Gas connection to boiler; G1" female thread
[GAS P]
Gas connection to pump group; Rp1" female thread
[PF]
Pump group flow; G1½" male thread, flat seal
[PR]
Pump group return; G1½" male thread, flat seal
The servicing clearances required are:
• in front:
50 mm
• below:
0 mm (250 mm with pump group)
• right side:
0 mm
• left side:
0 mm
• above:
30 mm.
The position selected for installation MUST allow adequate space for servicing in front of the boiler:
• in front:
550 mm
• below:
350 mm
• right side:
0 mm
• left side:
0 mm
• above:
40 mm.
6720813171 (2015/04)
6
465
152
AIC
FGC
1)
35
PF/PR
138
162
CDO
pump group (dimensions in mm)
520
0
0
AIC
FGC
300
CHF
GAS B
CHR
1)
CDO
39
130
130
PF
GAS A
PR
CS
140
Dimensions of boiler
6 720 648 726-007.1TD
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gb162-80Gb162-65Gb162-100

Table of Contents