Hangar 9 P-51 Mustang 1.50 ARF Assembly Manual page 48

Table of Contents

Advertisement

Section 17B: Engine Installation (Saito 200 TI)
Step 7
Drill the locations for the new bolts using a 1/4" drill bit.
Step 8
Install your particular motor mount using four 8-32 bolts,
four washers and the blind nuts removed in Step 2.
48
Step 9
Install any accessories that may be required for your
particular engine. In the case of the Saito 200TI, a
needed valve must be attached to the mount. Make
any necessary adjustments to the fuselage to provide
clearance if required.
Step 10
Install the engine of your choice at this time. Use the
method described in Step 5 of Section 17A to position
the engine fore and aft.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents